Taike Machinery water filling machine production line

5 Gallon Water Filling Machine

QGF Series 5 gallon water filling machine is specially used for 3/5 Gallon barrel drinking water.

5 Gallon Water Filling Machine

QGF Series 5 gallon water filling machine is specially used for 3/5 Gallon barrel drinking water.

Description:

This machine is main equipment for the 5 gallon barreled drinking water filling production line, it is made up of frame, water tank, pipeline, water pump, pneumatic cylinder, transmission and electrical apparatus and so on, it accomplishes washing filling and capping motion, it comes true stabilize washing effect, accurate filling volume and seal cap pressing effect by the way muti-passes washing processes, filling volume and automatic sorting and capping and full computer control.

Filling process:Barrels move 180 degree along with conveying chain wheel and to turnover frame, and then barrels are pushed into filling machine by barrel pushing cylinder and located on conveyor belt and waiting for filling. Sterilized empty barrels to filling position are located by location cylinder, and then filling valves enter into barrel and open filling pump for filling, filling time set by PLC, it can correct filling time up to optimum condition by muti-function button on panel according to height of liquid level.

Features:

  1. Integrates bottle washer, filler and sealer into one unit;
  2. Made of high quality stainless steel, corrosion proof and easy to be cleaned or washed;
  3. bottle washer adopts multiple liquid injections washing and disinfectant spray, and washing solution can be used circularly;
  4. Imported famous brands are adopted in respect of key electrical and pneumatic components;
  5. All the pumps are Nanfang pump which is the NO.1 in China;
  6. Uploading and dropping barrels changed from 45 degree to translatory which is more stable.
  7. Nozzle can insert into 10-15cm of the barrel in order to rinse little impurities down. Rinsing pump is separately controlled by different magnetic valves. Pump only work when there is barrel on that. It can avoid the mixture of different cleaning fluid.

Product Parameter:

QUALITY ASSURANCE

International Quality Certifications

Every CGF-series machine ships with full certification documentation.

CE Marking — EU Machinery & EMC Directive
CE Marking EU Machinery & EMC Directive
ISO 9001:2015 — Quality Management System
ISO 9001:2015 Quality Management System
SGS Audited — Factory & Quality Inspection
SGS Audited Factory & Quality Inspection
Bureau Veritas — International Factory Verification
Bureau Veritas International Factory Verification

BUYER FAQ

Frequently Asked Questions

Common questions from buyers about Taike Machinery's products, ordering process, and after-sales support.

How do I request a quotation from Taike?

Submit your requirements via the inquiry form on this page or contact us directly by phone, WhatsApp, or e-mail. Please include your target production capacity (BPH or bottles/hour), container type and size, beverage category, and any special requirements. Our sales team will review your brief and reply with a preliminary machine recommendation and indicative pricing.

What certifications do Taike machines carry?

Taike machines are CE-marked in compliance with the EU Machinery Directive and manufactured under ISO 9001 quality management. CE certification covers electrical safety, mechanical safety, and applicable pressure equipment regulations — meeting import requirements for Europe, the Middle East, Southeast Asia, and many other regulated markets. Documentation packs are provided with each shipment.

Can machines be customised to our specific production requirements?

Yes. All Taike machines support custom configuration including output capacity, container format (bottle diameter, height, neck finish), filling head count, local voltage/frequency, material grade (SUS304 or SUS316L), and optional features such as nitrogen flushing, weight-type filling, or clean-room enclosures. Customisation scope and costs are confirmed during the quotation stage.

What is the typical lead time from order to delivery?

Lead time depends on machine type and configuration. Standard models typically require 45–75 working days from deposit receipt to factory completion, subject to the current production schedule. Custom or large-scale complete-line projects may require a longer manufacturing window. We conduct a pre-shipment run-off test before packing and provide video documentation of the test run for your review.

Do you provide on-site installation and commissioning?

On-site installation and commissioning by Taike engineers is available as a paid service. Our technicians travel to your facility for machine installation, trial production run, and operator training before formal handover. Remote video commissioning support — where our engineers guide your local team via live video call — is also available as a lower-cost alternative. Terms and costs are defined in the sales contract.

What after-sales support and spare parts service do you offer?

Each machine ships with a standard warranty covering manufacturing defects and is accompanied by a spare-parts kit for critical wear components. Technical support is available during China business hours by phone, WhatsApp, or e-mail. Our engineering team typically aims to respond to fault queries within 2 business days. A recommended spare-parts list for long-term operation is provided with all shipments, and spare parts can be ordered directly from our factory at any time.

AFTER-SALES SUPPORT

From Factory to Full Production —We're With You Every Step

A filling machine is a long-term production asset. Taike's service programme covers the full lifecycle from installation through to long-term spare-parts supply, ensuring your line runs at rated capacity from day one.

01

On-site Installation & Commissioning

Taike engineers travel to your facility to complete mechanical installation, utility connection, trial production run, and formal handover. Available for projects worldwide — costs and schedule confirmed at contract stage.

02

Remote Video Commissioning

Where travel is restricted or timelines are tight, our engineers guide your local team through startup via live video call — covering mechanical checks, PLC parameter setup, and first-bottle production, with the same rigour as on-site.

03

Operator Training & Documentation

A structured training programme covers HMI operation, filling adjustment, format changeover, CIP cleaning, and fault diagnosis. Complete operation and maintenance manuals are supplied in English and can be localised on request.

04

Spare Parts & Long-term Supply

Every machine ships with a critical-wear spare-parts kit and a recommended long-term parts list. All spare parts — including filling valves, rinsing nozzles, and capping heads — can be ordered directly from Taike factory at any time after delivery.

Get a Machine Quote

Request a Filling Line Quote

Tell us your target BPH, bottle sizes, and beverage type. Our engineering team will respond within 24 hours with a detailed machine specification, footprint drawing, and transparent pricing.

15+ Years of Experience
50+ Export Markets
ISO 9001 Certified

Send Us Your Requirements

We'll respond with a detailed machine proposal within 24 hours.