Taike Machinery water filling machine production line

Automatic Mineral Spring Water Filling Machine

This series of automatic mineral spring water filling machine apply to the production of mineral water, purified water, flavor water and low alcoholic drinks, etc.

Automatic Mineral Spring Water Filling Machine

This series of automatic mineral spring water filling machine apply to the production of mineral water, purified water, flavor water and low alcoholic drinks, etc.

Mineral Spring Water Filling Machine

Application:

1) It is adopted that direct connection between air conveyor and inlet starwheel instead of screw and conveyor chains, which is easier for bottle changing.
2) There is no need to adjust the height of equipments through neck holding tech for bottle transportation. And what is only to change some spare parts.
3) High speed filling line is of clamp transferring technology. Bottle shapes are more varied, and the working table inside the machine is more laconic.
4) By 3-in-1 mono-block, the bottle goes through rinsing, filling and capping with little abrasion, and the transferring is stable, bottle changing is easier.
5) Specially designed stainless steel bottle clamp dose not contact the thread parts of the bottle neck, avoiding the second contamination.
6) High speed and large flow filling valve assures the high filling speed and exact fluid level.
7) Parts contact with the liquid are all of excellent stainless steel or food level plastic. The electric system is of international brand and achieves the national food sanitary standard.
8) The bottle-out starwheel is of screwdown shape. When bottle size is changed, there is no need to adjust the transferring chain’s height.

Flow Chart:

Automatic bottle blowing machine –> Air conveyor system–>Washing,filling ,capping 3in1 machine–>Conveyor system–>Automatic sleeve labeling machine–>Automatic film shrink packing machine/Carton packing machine

automatic Pure water filling machine3

Product Parameter:

QUALITY ASSURANCE

International Quality Certifications

Every CGF-series machine ships with full certification documentation.

CE Marking — EU Machinery & EMC Directive
CE Marking EU Machinery & EMC Directive
ISO 9001:2015 — Quality Management System
ISO 9001:2015 Quality Management System
SGS Audited — Factory & Quality Inspection
SGS Audited Factory & Quality Inspection
Bureau Veritas — International Factory Verification
Bureau Veritas International Factory Verification

BUYER FAQ

Frequently Asked Questions

Common questions from buyers about Taike Machinery's products, ordering process, and after-sales support.

How do I request a quotation from Taike?

Submit your requirements via the inquiry form on this page or contact us directly by phone, WhatsApp, or e-mail. Please include your target production capacity (BPH or bottles/hour), container type and size, beverage category, and any special requirements. Our sales team will review your brief and reply with a preliminary machine recommendation and indicative pricing.

What certifications do Taike machines carry?

Taike machines are CE-marked in compliance with the EU Machinery Directive and manufactured under ISO 9001 quality management. CE certification covers electrical safety, mechanical safety, and applicable pressure equipment regulations — meeting import requirements for Europe, the Middle East, Southeast Asia, and many other regulated markets. Documentation packs are provided with each shipment.

Can machines be customised to our specific production requirements?

Yes. All Taike machines support custom configuration including output capacity, container format (bottle diameter, height, neck finish), filling head count, local voltage/frequency, material grade (SUS304 or SUS316L), and optional features such as nitrogen flushing, weight-type filling, or clean-room enclosures. Customisation scope and costs are confirmed during the quotation stage.

What is the typical lead time from order to delivery?

Lead time depends on machine type and configuration. Standard models typically require 45–75 working days from deposit receipt to factory completion, subject to the current production schedule. Custom or large-scale complete-line projects may require a longer manufacturing window. We conduct a pre-shipment run-off test before packing and provide video documentation of the test run for your review.

Do you provide on-site installation and commissioning?

On-site installation and commissioning by Taike engineers is available as a paid service. Our technicians travel to your facility for machine installation, trial production run, and operator training before formal handover. Remote video commissioning support — where our engineers guide your local team via live video call — is also available as a lower-cost alternative. Terms and costs are defined in the sales contract.

What after-sales support and spare parts service do you offer?

Each machine ships with a standard warranty covering manufacturing defects and is accompanied by a spare-parts kit for critical wear components. Technical support is available during China business hours by phone, WhatsApp, or e-mail. Our engineering team typically aims to respond to fault queries within 2 business days. A recommended spare-parts list for long-term operation is provided with all shipments, and spare parts can be ordered directly from our factory at any time.

AFTER-SALES SUPPORT

From Factory to Full Production —We're With You Every Step

A filling machine is a long-term production asset. Taike's service programme covers the full lifecycle from installation through to long-term spare-parts supply, ensuring your line runs at rated capacity from day one.

01

On-site Installation & Commissioning

Taike engineers travel to your facility to complete mechanical installation, utility connection, trial production run, and formal handover. Available for projects worldwide — costs and schedule confirmed at contract stage.

02

Remote Video Commissioning

Where travel is restricted or timelines are tight, our engineers guide your local team through startup via live video call — covering mechanical checks, PLC parameter setup, and first-bottle production, with the same rigour as on-site.

03

Operator Training & Documentation

A structured training programme covers HMI operation, filling adjustment, format changeover, CIP cleaning, and fault diagnosis. Complete operation and maintenance manuals are supplied in English and can be localised on request.

04

Spare Parts & Long-term Supply

Every machine ships with a critical-wear spare-parts kit and a recommended long-term parts list. All spare parts — including filling valves, rinsing nozzles, and capping heads — can be ordered directly from Taike factory at any time after delivery.

Get a Machine Quote

Request a Filling Line Quote

Tell us your target BPH, bottle sizes, and beverage type. Our engineering team will respond within 24 hours with a detailed machine specification, footprint drawing, and transparent pricing.

15+ Years of Experience
50+ Export Markets
ISO 9001 Certified

Send Us Your Requirements

We'll respond with a detailed machine proposal within 24 hours.